You do not need to be an engineer to ask the right questions on site. These fifteen checks are the ones that catch most avoidable defects, organised by the stage at which they must happen — because a check performed after the next stage has covered the work is only a record of a problem, not a chance to fix it.

Foundation and plinth

  1. Layout diagonals. Before excavation, the two diagonals of the building outline should be equal. A skewed layout is expensive to correct later.
  2. Footing depth and soil. Depth matches the schedule; the soil at the base matches the report.
  3. Reinforcement before pour. Bar sizes, spacing and cover blocks checked against the drawing — with photographs.
  4. Plinth filling in layers. Compacted in 150–200 mm layers, watered and rammed; not dumped and levelled.
  5. Damp-proof course. A continuous layer at plinth level before wall construction starts.

Superstructure

  1. Formwork line, level and plumb. Check with a level and plumb bob before reinforcement goes in.
  2. Slab top steel on chairs. Top bars that have been walked down into the middle of the slab do nothing.
  3. Concrete cubes and slump. Cubes cast every pour; slump within the design range (typically 75–125 mm for pumped RMC).
  4. Curing. Slabs ponded or kept wet for the full period; columns wrapped and wetted.
  5. Block work plumb and bonded. Vertical joints staggered; lintels over every opening; mesh at RCC–masonry junctions.

Services and finishing

  1. Chases before plaster. All conduits and pipes fixed before plastering; chases filled with mesh.
  2. Plumbing pressure test. Lines tested and held before they are concealed.
  3. Waterproofing ponding test. Terrace and bathrooms flooded for 48–72 hours and the underside checked before tiling.
  4. Floor slope to drains. Water poured on bathroom and balcony floors should reach the drain without pooling.
  5. Earthing and continuity. Earth resistance measured; every metal enclosure bonded.

The most common failures these checks prevent are described in Common Construction Mistakes That Cause Cracks Later.

Frequently asked questions

Which single check matters most?

Reinforcement before every pour. Once concrete covers the bars, nothing about them can be verified or corrected. Ask for dated photographs of every reinforcement stage.

Should I hire an independent engineer to check the work?